BTS 75V Series Door Closer
Specifications
Product Details
- Adjustable Spring Sizes: Adjustable spring power from size 1-4 allows the necessary adjustment required for both barrier-free and non-barrier-free openings, giving ultimate installation flexibility
- Applications: Trouble-free performance under adverse climatic and traffic conditions make the BTS75V floor-concealed closer dependable and a perfect choice for even the most rigorous applications. For total control and uncompromising creativity for any door opening, specify a BTS75V floor-concealed closer.
Templates/Technical Drawings
Click on the blue link under Template ID to open the template you wish to view.
| Template ID | Description |
| BTS-77 | BTS75V A Package Aluminum Door and Frame Center Hung Double-Acting |
| BTS-77 | BTS75V B Package Wood or Steel Door and Frame Center Hung Double-Acting |
| BTS-79 | BTS75V C Package 1-1/2" Offset Hung Single-Acting |
| BTS-78 | BTS75V D Package 3/4" Offset Hung Single-Acting |
| BTS-78 | BTS75V E Package 20-minute Rated 3/4" Offset Hung Single-Acting |
| BTS-78 | BTS75V F Package 3-hour Rated 3/4" Offset Hung Single-Acting |
| BTS-77 | BTS75V G Package Aluminum Door and Frame Center Hung Single-Acting |
| BTS-77 | BTS75V H Package Wood or Steel Door and Frame Center Hung Single-Acting |
| BTS-80 | BTS75V I Package (Push and Pull Side) Independent Hung Door Hung with Hinges |
| BTS-82 | BTS75V IF Package Independent Hung 3-hour Rated Steel Doors with Hinges and Surface Applied Track |
| BTS-55 | BTS75V L Package 3/4" Offset for Lead Lined Doors |
| BTS-83 | BTS75V PF Package 3-hour Rated Pocket Pivots with Mortise Track and 75523 Pivots |
| BTS-78 | BTS 75V/D,E,F & BTS80/D,E,F,L 3/4" Offset Cement Case Placement |
Installation Instructions
Click on the blue drawing number link under Template ID to open the installation instruction you wish to view.
| Template ID | Description |
|---|---|
| 08076341 | BTS75V Series A Package Aluminum Door and Frame Center Hung Double-Acting Installation Instructions |
| 08076342 | BTS75V Series B Package Wood or Steel Door and Frame Center Hung Double-Acting Installation Instructions |
| 08076343 | BTS75V Series C Package 1-1/2" Offset Hung Single-Acting Installation Instructions |
| 08076344 | BTS75V Series D Package 3/4" Offset Hung Single-Acting Installation Instructions |
| 08076345 | BTS75V Series E Package 20-minute Rated 3/4" Offset Hung Single-Acting Installation Instructions |
| 08076345 | BTS75V Series F Package 3-hour Rated 3/4" Offset Hung Single-Acting Installation Instructions |
| 08076341 | BTS75V Series G Package Aluminum Door and Frame Center Hung Single-Acting Installation Instructions |
| 08076342 | BTS75V Series H Package Wood or Steel Door and Frame Center Hung Single-Acting Installation Instructions |
| 08083290 | BTS75V Series I Package (Pull Side) Independent Hung Door Hung with Hinges Installation Instructions |
| 08083291 | BTS75V Series I Package (Push Side) Independent Hung Door Hung with Hinges Installation Instructions |
| BTS-88 | BTS75V Series Threshold Preparation I Package Instructions |
| 08083293 | BTS75V Series PF Package 3-hour Rated Pocket Pivots with Mortise Track and 75523 Pivots Installation Instructions |
| 08076340 | BTS75V Series Installation Instructions |
Miscellaneous Instructions
Click on the blue link under Drawing ID to open the miscellaneous instruction you wish to view.
| Drawing ID | Description |
|---|---|
| LM-42 | BTS75V HD 8062 Top Pivot Center Hung Heavy Duty |
| LM-33 | BTS75V E 8062 Electrified Center Hung Top Pivot |
| LM-35 | BTS75V 75220, 75222, 75223 3/4" Offset Intermediate Pivots Used with D, E, F Packages |
| LM-14 | BTS75V 75200, 3/4" Offset Full Mortise Electric Intermediate Pivot (Handed) |
| LM-37 | BTS75V 75240 Lead Lined Intermediate Pivot Used with L Package |
| LM-39 | BTS75V 15220 1-1/2" Offset Intermediate Pivot Used with C Package |
| BTS-77 | BTS75V Series Cement Case Preparation Center Hung Instructions |
| BTS-79 | BTS75V Series Cement Case Preparation 1-1/2" Offset Instructions |
| BTS-78 | BTS75V Series Cement Case Preparation 3/4" Offset Instructions |
| BTS-28 | BTS75V Series Threshold Preparation Center Hung Instructions |
| BTS-26 | BTS75V Series Threshold Preparation 3/4" Offset Instructions |
| BTS-27 | BTS75V Series Threshold Preparation 1-1/2" Offset Instructions |
| BTS-86 | BTS75V Series Terrazo Pan Center Hung Instructions |
| BTS-85 | BTS75V Series Terrazo Pan 3/4" Offset Instructions |
| 08280640 | BTS75V Series Terrazo Pan 1-1/2" Offset Instructions |
| 08076345 | BTS75V Series SC-1 Sealing Compound Instructions |
| BTS-75V | Fixing Instructions |
| 0700286 | BTS Applications & Accessories |